multicalci.com
Beta · free during launch

BOQ Capital Cost Estimator

Pick a template, answer the questions an estimator would ask, and get a tiered capital cost sheet — escalated to current indices, adjusted to your region, with built-in engineering compliance checks.

114templates
1,400+line items
8regions
±30/20/10%estimate tiers
1 · CHOOSE TEMPLATE
2 · TIER & LOCATION
3 · SPECIFICATION
4 · COST SHEET

What are you estimating?

Type anything — equipment, activity, or material. “centrifugal pump”, “switchgear”, “earthwork”, “DCS”…

All 💊 Pharma 🛢️ Oil & Gas ⚡ Power 💧 Water / ETP 🏭 Manufacturing 🛡️ Control & Safety 🏗️ Civil works
Loading templates…
Estimates are budgetary (AACE Class 5–3 by tier) and exclude taxes unless stated. Import duties are indicative — verify HS codes. Cost basis: USD 2024 libraries escalated by CEPCI / ENR CCI, regional factors applied. © multicalci.com