← All standards & equipment
API

API 1104

Welding of Pipelines and Related Facilities

Issuing body
API
Latest edition
22nd Edition (2021)
Region
USA, Global
Equipment items
2

Scope

Welding procedures, welder qualification and NDE for cross-country pipelines.

Key requirements (7)

  • Welding of pipelines and related facilities.
  • Procedure qualification: PQR with mechanical tests (tensile, bend, nick break, Charpy where required).
  • Welder qualification by destructive bend tests OR radiography.
  • Acceptance criteria (Section 9): undercut, porosity, slag, lack of fusion limits.
  • RT acceptance: porosity max 1/8" diameter, max 4 in 6" weld length (general).
  • Automated UT (AUT) increasingly used for offshore / large diameter.
  • Annex A: alternative acceptance via fitness-for-purpose (ECA).

Related standards (3)

Applied to 2 equipment items